Steel roofing is a more durable product with lower life-cycle costs than most other roofing…
Foundation Requirements for a Cleary building
The foundation for the Cleary Building is designed to have the building columns placed in ground. A level building site is all that is required to start construction of your Cleary building. A concrete floor can be poured after the building has been enclosed, thus reducing concrete exposure to the elements during installation.